Aim
The degree of renovation will depend on if you play other sports or use the outfield for other things such as car parks etc. But you should aim for a smooth even surface free from weeds and weed grasses.
How it’s used
The main renovation operations are: -
1. Scarification/harrowing
2. Aeration
3. Seeding
4. Fertilising
5. Sand Top Dressing
The degree of the operations will depend on the profile and surface assessment.
Timing of use
If winter games are played then the renovation should be done in March/April. If the outfield has no other use then renovation should take place in September.
Effects of incorrect procedure
The renovation of the outfield will level the surface and improve drainage making it safe to field. It not a ball could hit a player in the face.
Equipment needed
See Operations.
Practical Tips
Check and rod pipe drainage systems and silt traps where installed.