- Aim:
To provide a pitch that maintains
- A safe surface
- Aesthetic appearance
- Durability
- Life expectancy
- Playability
- Positive contribution to standard of pitch/es.
Understanding:
- General
Method:
- Mowing
- Aeration
- Over seeding
- Fertiliser Application
- Line marking
- Surface Preparation
- Surface Renovation
Timing:
- All year round
Effects of incorrect procedure:
- Unsafe surface
- Cumulative degradation of playing surface.
- Capital/Grant expenditure to renovate the playing surface.
- Poor standard pitch/s
- Loss of play due to poor surface conditions.
- Loss of matches
- Player injury
- Loss of revenue
Equipment:
- Various
Practice Tips:
- Assess the surface
- Implement proactive maintenance programme
- Ensure that maintenance is carried out under the correct weather conditions and at the right time of year.
- If in doubt, contact a qualified Sports Surface Consultant.